Jump to content
Toggle menu
Toggle preferences menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

Naikar Port: Difference between revisions

From Attu Project
Content deleted Content added
Dervot (talk | contribs)
Redundo the wundo
Dervot (talk | contribs)
Removal of familu
Line 4: Line 4:


== History ==
== History ==
Following the [[Grand Calming]], [[Kingdom of Akaria|Akaria]] required an international port to facilitate trade with other nations. Construction of the Naikar Port began on 27-3 1 PC being headed by the [[High Director of the Akarian Trade Fleet]] [[Johnakar Oken]]. Construction of the port concluded on 24-12 of the same year.
Following the [[Grand Calming]], [[Kingdom of Akaria|Akaria]] required an international port to facilitate trade with other nations. Construction of the Naikar Port began on 27-3 1 PC being headed by the [[High Director of the Akarian Trade Fleet]], [[Johnakar Oken]]. Construction of the port concluded on 24-12 of the same year.


== Main areas ==
== Main areas ==
Line 10: Line 10:
* The [[Adazete Port]]: This is the larger outer dock of the port, where most trade is done.
* The [[Adazete Port]]: This is the larger outer dock of the port, where most trade is done.
* The [[Vakair Dock]]: An all purpose dock reserved for use by the [[Akarian Navy]].
* The [[Vakair Dock]]: An all purpose dock reserved for use by the [[Akarian Navy]].
* The [[Oken Marina]]: A medium sized marina reserved for members of the Oken Family.
* The [[Oken Marina]]: A medium sized marina reserved for members of the Oken.


[[Category:Ports in Akaria]]
[[Category:Ports in Akaria]]

Revision as of 00:28, 15 May 2024

Naikar Port is the internationaal port of Oksken, Akaria.

It's size and early construction has led the Naikar Port to being the bussiest port in Akaria. The port also has significant repair and maintenance facilities that are used by the Akarian Navy and the Akarian Trade Fleet.

History

Following the Grand Calming, Akaria required an international port to facilitate trade with other nations. Construction of the Naikar Port began on 27-3 1 PC being headed by the High Director of the Akarian Trade Fleet, Johnakar Oken. Construction of the port concluded on 24-12 of the same year.

Main areas

  • The Adazete Port: This is the larger outer dock of the port, where most trade is done.
  • The Vakair Dock: An all purpose dock reserved for use by the Akarian Navy.
  • The Oken Marina: A medium sized marina reserved for members of the Oken.