Faltir-Niueyjar Tunnels: Difference between revisions
From Attu Project
More actions
Content deleted Content added
Created page with "The '''Faltir-Niueyjar Tunnels''' are a pair of tunnels going between Niueyjar and Faltir. == Proposal == The construction of the tunnels was initially proposed to facilitate easier transportation of people and goods between Niueyjar and Faltir. == Construction == Construction of the tunnels began on 23-9 7 PC. Category:Infrastructure in Faltir Category:Infrastructure in Niueyjar" |
No edit summary |
||
| Line 6: | Line 6: | ||
== Construction == |
== Construction == |
||
Construction of the tunnels began on 23-9 7 PC. |
Construction of the tunnels began on 23-9 7 PC. |
||
Construction of the tunnels was temporarily halted from 4-11 7 PC when Faltir began cutting ties with the outside world and 16-12 7 PC, when the Niueyjar took control of Faltir following the start of [[The Great Exile]]. |
|||
[[Category:Infrastructure in Faltir]] |
[[Category:Infrastructure in Faltir]] |
||
[[Category:Infrastructure in Niueyjar]] |
[[Category:Infrastructure in Niueyjar]] |
||
Revision as of 20:15, 12 February 2024
The Faltir-Niueyjar Tunnels are a pair of tunnels going between Niueyjar and Faltir.
Proposal
The construction of the tunnels was initially proposed to facilitate easier transportation of people and goods between Niueyjar and Faltir.
Construction
Construction of the tunnels began on 23-9 7 PC.
Construction of the tunnels was temporarily halted from 4-11 7 PC when Faltir began cutting ties with the outside world and 16-12 7 PC, when the Niueyjar took control of Faltir following the start of The Great Exile.