Southern Bypass Motorway: Difference between revisions
From Attu Project
More actions
Content deleted Content added
Created page with "The Tieteran East-West Highway conects the two sides of Tietero together. == History == Construction of the highway began on 9-8 9 PC. Category:Roads in Tietero" |
No edit summary |
||
| Line 1: | Line 1: | ||
The Tieteran East-West Highway |
The '''Tieteran East-West Highway''' connects the two sides of Tietero together. |
||
== History == |
== History == |
||
Revision as of 21:40, 12 March 2024
The Tieteran East-West Highway connects the two sides of Tietero together.
History
Construction of the highway began on 9-8 9 PC.