Circuit City: Difference between revisions
More actions
Created page with "'''Circuit City''' is a town in Panifra, within the Caseic Federation. Its construction began in 58 PC as a result of a trade deal with La Rossa in which the Federation received La Rossan circuits. Category:Panifra Category:Caseic Archipelago pages" |
No edit summary |
||
| Line 1: | Line 1: | ||
'''Circuit City''' is a town in [[Panifra]], within the [[Caseic Federation]]. Its construction began in 58 PC as a result of a trade deal with [[La Rossa]] in which the Federation received La Rossan circuits. |
'''Circuit City''' ({{langx|ca|Ibewe sa Grasnec}}) is a town in [[Panifra]], within the [[Caseic Federation]]. Its construction began in 58 PC as a result of a trade deal with [[La Rossa]] in which the Federation received La Rossan circuits. |
||
== History == |
|||
In 58 PC, a trade deal between La Rossa and the Caseic Federation resulted in the beginning of construction for Circuit City as a place to develop products from imported Rossan circuits. |
|||
In the 60s and 70s PC, as the ongoing war with Prefichi caused funding for Circuit City to diminish, the construction of Circuit City, which had already been progressing slowly, began to grind to a halt. In 78 PC, a strike began, with the builders of Circuit City claiming that the Federal Council had failed to fund the construction. |
|||
[[Category:Panifra]] |
[[Category:Panifra]] |
||
Latest revision as of 09:14, 19 April 2026
Circuit City (Caseic: Ibewe sa Grasnec) is a town in Panifra, within the Caseic Federation. Its construction began in 58 PC as a result of a trade deal with La Rossa in which the Federation received La Rossan circuits.
History
In 58 PC, a trade deal between La Rossa and the Caseic Federation resulted in the beginning of construction for Circuit City as a place to develop products from imported Rossan circuits.
In the 60s and 70s PC, as the ongoing war with Prefichi caused funding for Circuit City to diminish, the construction of Circuit City, which had already been progressing slowly, began to grind to a halt. In 78 PC, a strike began, with the builders of Circuit City claiming that the Federal Council had failed to fund the construction.