Toggle menu
Toggle preferences menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

Faltir-Niueyjar Tunnels: Difference between revisions

From Attu Project
Content deleted Content added
Dervot (talk | contribs)
No edit summary
WalterWhiteOnWiki (talk | contribs)
mNo edit summary
 
Line 8: Line 8:


Construction of the tunnels was temporarily halted from 4-11 7 PC when Faltir began cutting ties with the outside world. Niueyjar resumed construction of the tunnels on 2-2 8 PC after their takeover of Faltir fallowing the [[Great Exile|Great Exodus]].
Construction of the tunnels was temporarily halted from 4-11 7 PC when Faltir began cutting ties with the outside world. Niueyjar resumed construction of the tunnels on 2-2 8 PC after their takeover of Faltir fallowing the [[Great Exile|Great Exodus]].
[[Category:Infrastructure in Faltir]]
[[Category:Architecture of Faltir]]
[[Category:Infrastructure in Niueyjar]]
[[Category:Architecture of Niueyjar]]
[[Category:Faltir pages]]
[[Category:Faltir pages]]
[[Category:Niueyjar pages]]
[[Category:Niueyjar pages]]

Latest revision as of 08:26, 18 September 2025

The Faltir-Niueyjar Tunnels are a pair of tunnels going between Niueyjar and Faltir.

Proposal

The construction of the tunnels was initially proposed to facilitate easier transportation of people and goods between Niueyjar and Faltir.

Construction

Construction of the tunnels began on 23-9 7 PC.

Construction of the tunnels was temporarily halted from 4-11 7 PC when Faltir began cutting ties with the outside world. Niueyjar resumed construction of the tunnels on 2-2 8 PC after their takeover of Faltir fallowing the Great Exodus.