Faltir-Niueyjar Tunnels: Difference between revisions
From Attu Project
More actions
Content deleted Content added
No edit summary |
mNo edit summary |
||
| (One intermediate revision by one other user not shown) | |||
| Line 8: | Line 8: | ||
Construction of the tunnels was temporarily halted from 4-11 7 PC when Faltir began cutting ties with the outside world. Niueyjar resumed construction of the tunnels on 2-2 8 PC after their takeover of Faltir fallowing the [[Great Exile|Great Exodus]]. |
Construction of the tunnels was temporarily halted from 4-11 7 PC when Faltir began cutting ties with the outside world. Niueyjar resumed construction of the tunnels on 2-2 8 PC after their takeover of Faltir fallowing the [[Great Exile|Great Exodus]]. |
||
[[Category: |
[[Category:Architecture of Faltir]] |
||
[[Category: |
[[Category:Architecture of Niueyjar]] |
||
[[Category:Faltir pages]] |
|||
[[Category:Niueyjar pages]] |
|||
Latest revision as of 08:26, 18 September 2025
The Faltir-Niueyjar Tunnels are a pair of tunnels going between Niueyjar and Faltir.
Proposal
The construction of the tunnels was initially proposed to facilitate easier transportation of people and goods between Niueyjar and Faltir.
Construction
Construction of the tunnels began on 23-9 7 PC.
Construction of the tunnels was temporarily halted from 4-11 7 PC when Faltir began cutting ties with the outside world. Niueyjar resumed construction of the tunnels on 2-2 8 PC after their takeover of Faltir fallowing the Great Exodus.