Jump to content
Toggle menu
Toggle preferences menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

Caseic Blackout: Difference between revisions

From Attu Project
Content deleted Content added
Dervot (talk | contribs)
No edit summary
Dervot (talk | contribs)
No edit summary
Line 2: Line 2:


== Infrastructure attack ==
== Infrastructure attack ==
On 19-4 10 PC a coordinated attack on infrastructure throughout the Caseic Federation destroyed radio towers in [[Brenji]], [[Caifra]], and [[Ibe-Jibin]]. Framjist Rebels, led by [[Jirichaya Broom]], were suspected to have been behind the attacks and were later confirmed as such.
On 19-4 10 PC a coordinated attack on infrastructure throughout the Caseic Federation destroyed radio towers in [[Brenji]], [[Caifra]], and [[Ibe-Jibin]]. Framjist Rebels, led by [[Jirichaya Broom]], were suspected to have been behind the attacks and were later confirmed as such with Broom being sentanced to five years in prison on 13-5 10 PC .


[[Category:History of the Caseic Federation]]
[[Category:History of the Caseic Federation]]

Revision as of 07:27, 11 April 2024

The Caseic Blackout was a period from 19-4 10 PC to 24-4 11 PC in which the Caseic Archipelago was cut off from contact with other islands through the Inter-governmental Radio System.

Infrastructure attack

On 19-4 10 PC a coordinated attack on infrastructure throughout the Caseic Federation destroyed radio towers in Brenji, Caifra, and Ibe-Jibin. Framjist Rebels, led by Jirichaya Broom, were suspected to have been behind the attacks and were later confirmed as such with Broom being sentanced to five years in prison on 13-5 10 PC .