Caseic Blackout: Difference between revisions
From Attu Project
More actions
Content deleted Content added
No edit summary |
No edit summary |
||
| Line 2: | Line 2: | ||
== Infrastructure attack == |
== Infrastructure attack == |
||
19-4 10 PC a coordinated attack on infrastructure throughout the Caseic Federation |
On 19-4 10 PC a coordinated attack on infrastructure throughout the Caseic Federation destroyed radio towers in [[Brenji]], [[Caifra]], and [[Ibe-Jibin]]. Framjist Rebels, led by [[Jirichaya Broom]], were suspected to have been behind the attacks and were later confirmed as such. |
||
[[Category:Caseic Archipelago]] |
[[Category:Caseic Archipelago]] |
||
Revision as of 06:56, 11 April 2024
The Caseic Blackout was a period from 19-4 10 PC to 24-4 11 PC in which the Caseic Archipelago was cut off from contact with other islands through the Inter-governmental Radio System.
Infrastructure attack
On 19-4 10 PC a coordinated attack on infrastructure throughout the Caseic Federation destroyed radio towers in Brenji, Caifra, and Ibe-Jibin. Framjist Rebels, led by Jirichaya Broom, were suspected to have been behind the attacks and were later confirmed as such.