Toggle menu
Toggle preferences menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

Faltir-Niueyjar Tunnels: Difference between revisions

From Attu Project
Content deleted Content added
Dervot (talk | contribs)
No edit summary
Dervot (talk | contribs)
No edit summary
Line 7: Line 7:
Construction of the tunnels began on 23-9 7 PC.
Construction of the tunnels began on 23-9 7 PC.


Construction of the tunnels was temporarily halted from 4-11 7 PC when Faltir began cutting ties with the outside world and 16-12 7 PC, when the Niueyjar took control of Faltir following the start of [[The Great Exile]].
Construction of the tunnels was temporarily halted from 4-11 7 PC when Faltir began cutting ties with the outside world. Niueyjar resumed construction of the tunnels on 2-2 8 PC after their takeover of Faltir fallowing the [[Great Exile|Great Exodus]].
[[Category:Infrastructure in Faltir]]
[[Category:Infrastructure in Faltir]]
[[Category:Infrastructure in Niueyjar]]
[[Category:Infrastructure in Niueyjar]]

Revision as of 02:02, 18 February 2024

The Faltir-Niueyjar Tunnels are a pair of tunnels going between Niueyjar and Faltir.

Proposal

The construction of the tunnels was initially proposed to facilitate easier transportation of people and goods between Niueyjar and Faltir.

Construction

Construction of the tunnels began on 23-9 7 PC.

Construction of the tunnels was temporarily halted from 4-11 7 PC when Faltir began cutting ties with the outside world. Niueyjar resumed construction of the tunnels on 2-2 8 PC after their takeover of Faltir fallowing the Great Exodus.