Toggle menu
Toggle preferences menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

Power generation in Nongba

From Attu Project
Revision as of 17:13, 1 January 2024 by Dervot (talk | contribs)

History

The Yotumic Divisionary Federation began construction of their first wood-fuelled power plant on 13-4 2 PC.

By 27-7 2 PC a sixth of Nongba had enough power to run indoor lighting.

Accidents

On 26-7, 2 PC a 28-year-old man fell into one of the water vats at a wood-fuelled and was boiled alive.

Contents