Caseic Blackout
From Attu Project
More actions
The Caseic Blackout was a period from 19-4 10 PC to 24-4 11 PC in which the Caseic Archipelago was cut off from contact with other islands through the Inter-governmental Radio System.
Infrastructure attack
On 19-4 10 PC a coordinated attack on infrastructure throughout the Caseic Federation destroyed radio towers in Brenji, Caifra, and Ibe-Jibin. Framjist Rebels, led by Jirichaya Broom, were suspected to have been behind the attacks and were later confirmed as such.