Power generation in Nongba
From Attu Project
More actions
History
The Yotumic Divisionary Federation began construction of their first wood-fuelled power plant on 13-4 2 PC.
By 27-7 2 PC a sixth of Nongba had enough power to run indoor lighting.
Accidents
On 26-7, 2 PC a 28-year-old man fell into one of the water vats at a wood-fuelled and was boiled alive.